Scope of work included the demolition of the existing underground silos, hardscape, landscape, and storm drainage system. New storm drainage piping and equipment was installed to the existing storm drain pump system and a 37,500 square foot variable thickness reinforced slab was placed on the existing concrete slab to provide SDG&E with a new laydown/storage area for electrical transmission equipment.